Participatory budget of the university – University of Le Mans
Description of the project
Install survey ashtrays on campus to interact with students and university staff through closed-ended questions and reduce the number of discarded cigarette butts.
Financial estimate
Depending on the number of request ashtrays you want to install (around 200€ each).
Project manager(s).
Daham Karunanayake, student.
Description of the project
Create gardens on campus to accommodate students, staff and biodiversity according to different uses:
- quiet and rest area near the vegetable garden of the solidarity grocery store;
- An experimental area near the BiOSSE laboratory that biology teachers can use (plant physiology, etc.);
- workspace in front of the library.
These gardens aim to harness the ecological potential of the campus, satisfy the desire of users to enjoy the outdoors by allowing different uses, and gradually transform the campus into a place with its own identity, bringing together the biodiversity of nature and individuals. enabling all kinds of exchanges and encounters.
Financial estimate
Between 8,000 and 10,000 €.
Project manager(s).
Elia Vitrac, Alaoui Hachem and Élodie Papail, students.
Description of the project
Creation of a special site for university services to donate unused or more standard equipment to other departments or associations of the institution.
This would avoid the storage of unused equipment, the purchase of equipment that can be found elsewhere, and thus better manage the lifetime of equipment within the enterprise.
Financial estimate
Creation of a special site.
Project manager(s).
Olivier Landais, staff.
Description of the project
Install water fountains on campuses and primarily in libraries to improve user comfort while reducing the production of plastic waste. Currently, most toilets do not have a proper faucet to fill the water bottle.
These fountains will be connected to the drinking water network and will not be supplied with cylinders. They would allow fresh or lukewarm drinking water, even hot for teas and herbal teas, without handing out plastic cups.
Financial estimate
€1500 per water fountain.
Project manager(s).
Pauline Coisy and Amandine Chelli-Calippe, private.
Description of the project
Offer new students some must-have accessories to start the year off right with useful facilities that combine comfort and ecology that can be used on buses:
- an insulated cup or thermal cup to avoid waste when consuming a drink;
- reusable washable earmuffs for noise isolation and quiet operation;
- bag for carrying borrowed documents.
Financial estimate
From €6.50 to €10 per student. Scope: new students at the beginning of the academic year.
Project manager(s).
Pauline Coisy, staff.
Description of the project
Install a wind turbine photovoltaic shade that protects bicycles and vehicles from bad weather and heat. It will be integrated with charging stations for bicycles, scooters and electric cars to promote soft and alternative mobility.
Thanks to the student or professional card, the entire university community will be able to use the service.
Financial estimate
€10,000.
Project manager(s).
Florent Calvayrac, staff.
Description of the project
Between two courses, for example, create an on-campus lounge for students to relax or settle in during long breaks, thus avoiding car trips.
Financial estimate
About 4000 euros.
Project manager(s).
Morgane Dupe, student.
Description of the project
Set up picnic tables on campuses for lunch, but also for outdoor work.
Financial estimate
Depending on the number of tables installed (approximately 1000 euros each).
Project manager(s).
Muriel Leprette, staff.
Description of the project
Install rooftop wind turbines on the tallest buildings on campus to reduce electricity costs.
Financial estimate
Not mentioned.
Project manager(s).
Olivier Landais, staff.